Wiring up a Leading Edge Turbine wind system that uses a Tristar and dump load: Part 2
Having configured the Tristar charge controller for Diversion mode https://youtu.be/iMVMgwGOfg4 – we look at connecting the Tristar to the batteries, the dump load to the Tristar and finally the wind turbine to the battery bank. Your system is now and the PV can be installed alongside the wind turbine set-up.